NODELIFT / PUBLIC REFERENCE
Guides and operating contracts.
Public documentation for the current NodeLift pilot. Read implementation and verification boundaries before treating a documented route as a qualified capability.
Account setup and device enrollment belong in Hive. These are technical reference documents, with English source text preserved.
01
Architecture and execution
AVisual system architectureHive, regional hubs and peer devices; target topology and test deployment remain distinct.BHive execution authorityCoordinator and worker responsibilities, dispatch and execution boundaries.CLLM execution guideComplete-model worker execution, APIs, measurements and remaining limitations.
02
Nodes, models and measurements
AHardware and software probingInventory, backend detection and workload-specific qualification are separate.BModel catalog and peer file distributionPublic/private manifests and verified transfers; this is distinct from inference-state sharing.CEnergy evidence contractSensor source, scope, coverage and uncertainty accompany reported energy.
03